Supporting the Building of the Community for the Disabled “La Casa del Ciliegio”

Project location: ITALY, Rome
Project start date: April 2009 - Project end date: April 2010
Project number: 2009-08
Beneficiary: C.O.E.S ONLUS

January 2010 Interim Report

 Supporting the Building of the Community for the Disabled La Casa del Ciliegio

• building work completion: first and second floor windows, including squaring with foratelle, thresholds, upholstered counterframes, plaster and squaring volume scale

 Supporting the Building of the Community for the Disabled La Casa del Ciliegio


• water system realization (partly): for No. 3 bathrooms, 1 kitchen, 1 washroom, with Geberit multilayer plastic graft for the discharge of n. 15 pieces, including cold water line to the counter and domestic hot water from thermal power plant, and support walls


 Supporting the Building of the Community for the Disabled La Casa del Ciliegio


• thermal system (partly, excluded boiler): no.27 points to radians with copper covered in diameter and 14 cm columns of return from the central heating up to the manifold floor with copper clad diameter 18 cm, predisposition boiler with hot and cold water, return to the gas pipeline delivery point